Workspace / Command Center
SB
Chief of Staff.MARGN.AI

Completion Operating Board

Project lanes now resolve to concrete completion issues: finish line, current issue, blocker, acceptance test, and source path.
active issue review gate
Active lanesMissing API
Missing API
Completion issuesMissing API
Missing API
P0 quick winsMissing API
Missing API
Blocked gatesMissing API
Missing API
Revenue loopMissing API
Missing API
Product bet activeMissing API
Missing API
Infra systemsMissing API
Missing API
Decision debtMissing API
Missing API

Active lanes

One long-running agent stream per lane. The unit of work is now the issue, not the project label.

Missing API
P0active

Entrepreneurship / Revenue

MARGN

Prove one repeatable outbound revenue loop before adding more channels or website scope.

P1active

Entrepreneurship / Product

Triage

Pick one usable capability or blocker kill, then run it through verification.

P0active

Current job / Matri

Matri Wholesale + HATCH

Close the two job quick wins: lock Wholesale evals/deliver agent, deploy HATCH monitor package.

P2active

Infrastructure

AgDash + DB Dashboard

Make project/agent state visible enough that Mo does not need manual repo digging.

Completion issues

Specific issue-level work needed to get each active project to done. Mirrors .agents/issues/margn-chief-of-staff/issues.md.

Missing API
P0🟡 in progress

Matri Wholesale

Wholesale agent
/Users/mo_beig/Desktop/Personal Files/Projects/Matri/Wholesale/status.md
Finish lineProduction-ready Wholesale image agent delivered for Matri use.
Current issueWire source-preserving coordinate-crop as the primary production image workflow and clean build/lint for demo readiness.
Next issuePackage Matri demo/handoff with human review path and rejected-image revision rules.
Blocker / gateCoordinate-crop eval passed 12/12; remaining gate is production workflow wiring plus frontend build/lint and runtime artifact policy cleanup.
AcceptanceCoordinate-crop remains 12/12, architecture simplification is implemented as the primary path, frontend build/lint are green, demo/handoff is ready.
P0🔴 blocked

HATCH

HATCH agent
/Users/mo_beig/Desktop/Personal Files/Projects/HATCH/README.md + DEPLOYMENT.md + .github/workflows/mention-monitor.yml
Finish lineHeadless mention monitor running on a schedule and posting relevant HATCH mentions to Slack.
Current issueGitHub-only mention monitor deployment package is locally verified; production Actions run is blocked until the folder is published as a GitHub repo and Slack credentials are set.
Next issueSet Slack secret/vars, then run workflow_dispatch with seed_existing=true before enabling normal Slack posting.
Blocker / gateHATCH folder is not currently a git repository/GitHub remote; Slack credential is Mo-provided. SharePoint/Microsoft Graph is not required for the selected GitHub-only keyword path.
AcceptanceScheduled workflow runs every 30 minutes, old mentions are seeded without Slack spam, new relevant mention posts to the target Slack channel.
P0🟡 in progress

MARGN

Revenue agent
agents/email + agents/prospecting + interface/dashboard-app/app/control-panel/page.tsx
Finish lineFirst measured outbound batch proves or disproves the minimum revenue loop.
Current issueDecide and verify the lead-capture path before any send volume.
Next issueBuild 100-200 target accounts, validate 1-2 deliverable contacts/account, approve opener + follow-ups.
Blocker / gateSuppression gate code/test now fails closed on empty prod source; Workspace Assessment vs simple contact CTA remains undecided and CRM logging path still needs verification.
AcceptanceChosen lead-capture path is live/verified, CRM logging path is confirmed, suppression source passes with real rows, first 5-10 sends/day/mailbox are logged, and weekly readout shows bounce/reply/discovery metrics.
P1🟡 in progress

Triage

Product agent
/Users/mo_beig/code/triage/.agents/issues/temporal-completion/issues.md + 08-shadow-verification/issues.md
Finish lineOne product capability or blocker is shipped and verified this week.
Current issueComplete Temporal completion M8 shadow verification on triagev2.
Next issueIf M8 passes, close temporal-completion; if it fails, record the first failing deploy/smoke/log/Soda gate and assign the fix.
Blocker / gateShadow verification remains open: push to multi-account-multi-provider, deploy triagev2, browser smoke, Temporal/container logs, and Soda probes.
Acceptancetemporal-completion M8 issue shows push, shadow deploy, browser smoke, Temporal/container log review, and Soda checks complete with evidence.
P2✅ verified

AgDash

Infra agent
interface/dashboard-app/app/agents/page.tsx + interface/dashboard-app/lib/agents.ts + .agents/issues/margn-chief-of-staff/05-agdash/issues.md
Finish lineAgent/project status is visible without manual digging across repos and long-running agents.
Current issueAgDash now exposes the four active Chief of Staff lanes on /agents while keeping the MARGN dashboard separate.
Next issueReplace static lane mirror with live run/status feeds as each lane agent starts emitting evidence.
Blocker / gateLive source-of-truth feeds are not yet emitted by every lane agent; current implementation uses tracker-backed evidence paths.
AcceptanceAgDash shows current run/status for Wholesale, HATCH, MARGN, and Triage agents with links to evidence.
P2🔴 blocked

DB Dashboard

Infra agent
/Users/mo_beig/code/DB Dashboard/README.md
Finish lineSchema mapping review dashboard is deployable once and reusable by ingest repos.
Current issueResolve current repo changes and decide whether this is deployed now or only kept as a local control surface.
Next issueIf active, deploy Streamlit/API/Postgres stack and validate integration with sample ingest.
Blocker / gateRepo has uncommitted docs/script changes; deployment target/domain is not chosen.
AcceptanceDashboard/API reachable, validate_integration and HTTP ingest tests pass, integration instructions copied into the first ingest repo.

Weekly issue Gantt

This week clears Matri quick wins first, then MARGN revenue-loop gates, while infra wires visibility.

Missing API
IssueOwnerLane
MonTueWedThuFriSatSun
Wholesale architecture wiringCoordinate-crop eval is 12/12; wire the source-preserving coordinate-crop path into production and keep geometry deterministic.
WAWholesale agent
Current job / MatriP0
P0
Wholesale delivery packageImplement simplified image-agent boundary, clean build/lint, and prep Matri handoff/demo.
WAWholesale agent
Current job / MatriP0
P0
HATCH deploy decision + seedChoose GitHub or SharePoint keywords, set Slack credential, seed existing mentions, then turn on schedule.
HAHATCH agent + Mo
Current job / MatriP0
P0
MARGN suppression + lead captureVerify suppression source and choose simple CTA vs Workspace Assessment before building first batch.
RARevenue agent
Entrepreneurship / RevenueP0
P0
MARGN first batch prepBuild 100-200 accounts, validate contacts, approve opener/follow-ups, confirm CRM logging path.
RARevenue agent
Entrepreneurship / RevenueP0
P0
Triage M8 shadow verificationSelected sprint target: temporal-completion M8. Push/deploy shadow, browser smoke triagev2, review logs, and run Soda probes.
PAProduct agent + Mo
Entrepreneurship / ProductP1
P1
AgDash active-lane wiringExpose current run/status/evidence links for Wholesale, HATCH, MARGN, and Triage agents.
IAInfra agent
InfrastructureP2
P2
DB Dashboard decisionMissing API
DBInfra agent + Mo
InfrastructureP2
P2
Friday issue reviewAccept/reject each issue by acceptance criteria. Promote only the next concrete issue, not a vague project label.
CSMo + CoS
Operating rhythmGate
Gate

Portfolio list

Corrected categories with the next concrete move per project.

Missing API
Project
Category
Rank
Status
Next move
Matri Wholesale
Current job / Matri
P0
Active
Wire coordinate-crop as the primary path, clean build/lint, then prepare demo.
HATCH
Current job / Matri
P0
Blocked
Set Slack/keyword deployment path, seed, then enable scheduled monitor.
MARGN
Entrepreneurship
P0
Blocked
Verify suppression + lead capture, then run first measured outbound batch.
Triage
Entrepreneurship
P1
Active
Complete temporal-completion M8 shadow verification on triagev2.
AgDash
Infrastructure
P2
Active
Connect live run/status sources for active lanes.
DB Dashboard
Infrastructure
P2
Missing API
Missing API
YouTube
Entrepreneurship
P3
Support
Use only as MARGN lead-gen after outbound loop is operating.
Visibility Tool
Current job / Matri
P3
Queued
Return after Wholesale + HATCH are accepted.
Pricing Tool
Current job / Matri
P3
Queued
Return after quick wins unless Matri deadline changes.
TimeShifter
Entrepreneurship
P4
Parked
Reactivate only with a commercial path or defined sprint.
Swing Trading
Entrepreneurship
P4
Parked
Reactivate only if tied to active capital allocation.
Game / Mise
Side Projects
P4
Parked
No active agent until P0/P1 lanes are stable.